Saturday, January 25, 2014

Mas Mescla

 
The rest of the guys worked diligently on mixing mescal to pour the floor.  Wheelbarrow after wheelbarrow after bucket after buckets of mescal entered into the two classrooms.  Shovel after shovel after shovel of rocks, cement and water went into the mound to produce the mescal.  Inside the guys, Tommy, Banga Bud and Pastor Darwin were smoothing out the mescal as it entered the room.  Everyone was working hard at it.  Joel, Steve, Mike, Dudley, Tom, Jose, Edwin, David, Edgar, Meida and many more did all they could to get the two floors down before the end of the day.  
 
"And whatever you do, whether in work or deed, do it all in the name of Jesus, giving thanks through him to God our Father."
Colossians 3:17 

No comments:

Post a Comment