Wednesday, July 31, 2019

Loading Up the Trucks



Each day the team had job duties some inside the kitchen some outside near the bodega.  This week was a little different because Mr. Mike is putting in a new bridge to help with flooding during our massive rainstorms.  So the team had to bring their Gatorade and water coolers down the hill along with the food coolers for two different job sites. But this was one project Ana and Justin took seriously.  There was numerous days they did this together making several trips up the hill and back down the hill to make sure all coolers were secure on the two different vehicles. There was the Kia which had to be loaded daily and the first day only the medical supplies.  Once the medical supplies got there the first day they stayed in the church all week.  But everyone played their part daily in bringing all things needed to make their day complete.  Team work was definitely apart of this group of young adults.  Job well done and how we as adults can learn from each of you.




No comments:

Post a Comment