Thursday, November 5, 2015

Many Jobs for the Floor


 
It took everyone willing to help to get this floor down.  There was a group bringing the ingredients for the mixer to form the concrete.  This church should know to well the formula for this concrete mixer as their college group did the floor on the ministry campus in May.  It takes six buckets of sand, four buckets of rock, one bag of cement and water.  Bobby was in charge of the buckets of sand and rock.  They pushed the buckets through one of the windows of the church and they lined them up waiting to go into the mixer.  Samuel, Honduran, ran the mixer.  Gray, Mike and others lined up with the wheel barrows to gather the mixture to go and place it on the ground.  Franz, John and Pastor Carlos waiting and ready to spread the mixture smoothly into place.  This took place for three full days.  They all worked diligently and tirelessly on this project as the rafters were being welded in place above them. 
Now you are the body of Christ, and each one of you is a part of it.
1Corinthians 12:27
 

No comments:

Post a Comment