Monday, May 25, 2015

Gravel Pit Crew

 
Let me introduce to you the Gravel Pit Crew.  Thank you goes to Hannah, Maeghan, and Bethany.  These lovely ladies with the help of a shovel put rocks inside a five gallon bucket all day long.  They got their system going where one of them was taking a five minute break as needed.  Also would like to introduce the two strong young men Elliot and Evan who carried the five gallon bucket of rocks to the mixer.  It took two buckets of rocks per mixture for the concrete to be produced.  These two gentlemen however did not have a five minute break for they were the only two with this job until their friends Mike and Barry came along when they could to assist them.  These crew worked steadily all day long doing this one task.  Job well done Gravel Pit Crew.
 
"Therefore everyone who hears these words of mine and puts them into practice is like a wise man who built his house on the rock.
Matthew 7:24

No comments:

Post a Comment